July 27 – August 13, 2017

Pouring the footings

You can see the front porch, as well as the angles of the mandala being created.

Next the foundation walls are being built.

Electric lines are being run from the power pole across the driveway to a temporary power pole near the temple site.

Trenching for power and water needs to be completed so that the mechanical necessities for the in-floor heating can be installed before the slab for the entire floor can be poured. This is estimated to take about two weeks.

Also, at Nan’s request, Damon is building a Kiosk which will display the temple’s floor plan and exterior design.